Nafte Sefid oil field gas and oil system optimization & renewal project

Shanul Farayand Consulting Engineers Co.

Nafte Sefid oil field gas and oil system optimization & renewal project

image-project19

Nafte Sefid oil field gas and oil system optimization & renewal project

Scope of Work:
– Detail Engineering , procurement services for a new production unit ,25000 BBL/d oil &
30.4 MMSCF/d of gas. (EPC)
Client: National Iranian South Oil Co.
Duration: 30 Months
 Major Activities:
– Detail design (process, oil , gas, water separation, gas compression, oil transfer & boosting
pumps, mechanical, civil, electrical, control, safety, telecom, Hazop, modeling..) gas
compressors, oil pumps, chemical inj. packages, 40 Km. oil pipeline, 37 Km (60Kv)
Overhead power line, pumps shelter, compressors shelter, air cooled gas heat exch.
Oil/gas separators, stripper column, control bldng., electrical sub station & electrical room.
Fire& safety devices, pipe lines & manifold, etc.
-Procurement engineering services ,vendor documents review.
-Planning & project control

Starting year :

Execution time :

30

Client :

National Iranian South Oil Co.

Location :

-

Other projects

image-project15

Lavan Gas Wells No.2&3 Facilities & Gas Pipeline

image-project14

Nargesi Gas Gathering, Compression & Injection Project

image-project7

GOHT & KHT Units of Bandar Abbas Gas Condensate Refinery

image-project3

Isomerization Units of Bandar Abbas Gas Condensate Refinery