Nargesi Oil Production Unit Capacity Increasing

Shanul Farayand Consulting Engineers Co.

Nargesi Oil Production Unit Capacity Increasing

image-project16

Nargesi Oil Production Unit Capacity Increasing

Scope of Work:
-Detailed Design, Procurement, Construction (EPC) Oil production capacity increase from 15,000 BPD
to 25,000 BPD
Client: National South Oil Fields Co.
Duration: 20 Months
Project Progress: Completion
 Major Activities:
– 10″ oil pipeline (102km)
-Dismantling of existing Pumps, installation of new high capacity pumps ,Renovation of
instrumentation & Control system.

Starting year :

Execution time :

20

Client :

National South Oil Fields Co

Location :

-

Other projects

image-project14

Study And Preparation of Contracting Services and Preparation of Tender Documents – Completion of Nargesi Defects

Dismantling , Re-installation and Erection of Formalin Complex

Dismantling , Re-installation and Erection of Formalin Complex

Engineering Services and Basic Design for LPG Refrigeration, Storage  & Loading System

Engineering Services and Basic Design for LPG Refrigeration, Storage & Loading System

Site-Supervision-Engineering-Services-for-Bandar-Abbas-Gas-Condensate-Refinery-Featured-Img

Site Supervision Engineering Services for Bandar Abbas Gas Condensate Refinery

image-project24

Claim Management of Kharg Island Gas Gathering & NGL Recovery Project

image-project23

Flare Gas Recovery of Ahvaz-2 Oil Production and Gas Compression Units

image-project19

Nafte Sefid oil field gas and oil system optimization & renewal project

image-project16

Nargesi Oil Production Unit Capacity Increasing